Brake Pads Sourcing from Verified Chinese Factories
ECE R90 & FMVSS 135 certified. AQL-based sampling checks before shipment release. MOQ from 100 sets. 48-hour RFQ response.
Compatible Vehicle Brands
Toyota, Nissan, Hyundai, Kia, VW, BMW, Mercedes, and 200+ more
Material Options
Low-metallic, ceramic, semi-metallic, organic
Certifications Supported
ECE R90, FMVSS 135, SASO, GB 5763

RFQ snapshot
MOQ
100 sets per part number; 200 sets total for mixed orders
Standard Lead Time
25–35 days; 35–45 days for private-label packaging
Why Source Brake Pads with Kymon?
Kymon turns a part-category request into a supplier comparison path with fitment evidence, document review, and shipment planning.
Factory Audit Before Every New Supplier
We inspect production lines, QC systems, and certification documents before any factory enters our network. You only source from suppliers we have physically verified.
AQL 2.5 Pre-Shipment Inspection
Every shipment undergoes Level II sampling for dimensions, friction performance, shim adhesion, and hardware completeness. A full photo report is issued before release.
ECE R90 / FMVSS 135 / SASO Certification
Our factory network holds type approvals for major global standards. Certification documents are included with every shipment — no extra cost.
Container Consolidation
Mix brake pads with other part numbers in a single container. Kymon coordinates multi-factory orders into one consolidated shipment, cutting your per-unit freight cost.
Specs & Capabilities
Use these values as an RFQ baseline. Final options depend on OEM number, destination market, packaging, and supplier availability.
Compatible Vehicle Brands
Toyota, Nissan, Hyundai, Kia, VW, BMW, Mercedes, and 200+ more
Material Options
Low-metallic, ceramic, semi-metallic, organic
Certifications Supported
ECE R90, FMVSS 135, SASO, GB 5763
MOQ
100 sets per part number; 200 sets total for mixed orders
Standard Lead Time
25–35 days; 35–45 days for private-label packaging
Packaging
OEM-style box, neutral, or custom private-label
Incoterms Available
FOB, CIF, DAP, EXW

Fitment data to include
The fastest quotes include evidence that lets Kymon compare suppliers against the exact application, not only the category name.
OEM or reference part number
Vehicle make, model, year, engine, or VIN
Old part photos, drawings, or sample details
Target market, quantity, packaging, and certification needs
Client Result
🇦🇪 UAE — Auto Parts Wholesaler
Before Kymon
Sourcing from 3 separate suppliers with inconsistent batch quality and a 30%+ rejection rate. Frequent shipment delays with no on-ground support.
After Kymon
Single audited factory with standardized AQL 2.5 sampling checks before shipment release. 18 consecutive months without a customs hold.
Result signal: < 2% rejection rate across 24 shipments
Frequently Asked Questions
What certifications do your brake pads carry?
Our factory network produces brake pads certified to ECE R90 (Europe), FMVSS 135 (USA), and SASO (Saudi Arabia). We also support China GB 5763 standard pads for markets with no specific import requirement. Certification documents are included with every shipment.
What is the minimum order quantity (MOQ) for brake pads?
MOQ is 100 sets per part number. For mixed-vehicle orders the minimum is 200 sets total across all SKUs. We can consolidate multiple part numbers into a single container.
How do you ensure brake pad quality before shipment?
All shipments undergo AQL 2.5 Level II pre-shipment inspection covering dimensions, friction coefficient consistency, shim adhesion, hardware completeness, and packaging integrity. A full inspection report with photos is issued for every order.
Can you source brake pads for Japanese, Korean, and European vehicle models?
Yes. Our factory network covers OEM-equivalent fitment for Toyota, Nissan, Hyundai, Kia, VW, BMW, Mercedes, and other major brands. Provide the OEM part number or vehicle make/model/year and we will confirm availability within 24 hours.
What are typical lead times for brake pad orders?
Standard lead time is 25–35 days after order confirmation for stock items. Custom packaging or private-label orders may require 35–45 days. We provide factory production schedules upon request.
Related sourcing guides
Many importers consolidate several categories into one shipment. These guides are useful follow-up paths.

Control Arms
RFQ guideForged steel & cast iron. Sample approval before mass production. AQL-based inspection coordination available. CE documentation available. MOQ from 50 pieces.
View guide
Shock Absorbers
RFQ guideTwin-tube, monotube, and gas-pressurized. OEM spec matching from your sample. Fluid leak & force testing every batch. Private-label available.
View guide
Oil Filters
RFQ guideCellulose, synthetic blend, and full synthetic media. ISO 9001 & IATF 16949 production. SAE J1858 test reports available. MOQ from 500 pieces.
View guideGet Started
Get Supplier Quotes in 24–48 Hours
Tell us what you need and our sourcing team can get back to you with a detailed quote, supplier shortlist, factory recommendations, and sample availability.
- Free consultation with a dedicated sourcing manager
- Typical supplier or factory quotes in 24–48 hours
- Clear service terms and transparent pricing from day one
- Samples available before bulk order commitment
Submit Your RFQ
Fill in your details and requirements. The more information you provide, the faster we can respond.